Coal · Sakhalin · ~1,000 units
Solntsevsky coal mine
$180Meconomic effect for the customer over three years
+27%shovel-fleet productivity, 2025 against the 2021–2022 baseline
14.6% → 8.9%shovel idle time waiting for trucks, share of calendar time
Around a thousand units of equipment under management around the clock. The platform assigns trucks to shovels in real time, places equipment ahead of shift change and flags the refuelling moment that keeps a shovel working.
What we do not claim: of the 5.7 percentage point reduction in shovel idle time, 2.5 points — 44% — are attributable to balancing. The rest came from higher equipment availability, which is maintenance rather than software. Over the same period the average haul distance shortened from 3.9 to 3.6 km, which improves speed and cycle time on its own.
Gold · West Africa · pilot
Cloud pilot at a gold operation
95%+haul cycles recognised, verified against manual records
2 weeksfrom contract to live operation in the cloud
A limited fleet — several haul trucks and one shovel — instrumented and connected to a cloud instance. Detected cycles were compared against two independent sources: the operation’s manually recorded shift data and on-board records. Heat, dust, rainy season and intermittent LTE throughout.
The pilot led to a full-scale deployment contract, with a second stage covering auxiliary equipment, road condition monitoring and speed control.
We do not publish the customer’s name, the exact country or the fleet size: we hold no permission for them. We would rather describe the conditions precisely and leave the name out than describe neither.